分析空调维修中遇到的制冷故障

来源: 日期:2020-03-24 发布人:admin
  随着人们生活水平和工作条件的不断提高,空调和制冷系统在住宅建设项目中的应用越来越广泛,空调和制冷系统对工程项目正常使用的影响越来越大,因此空调和制冷系统在工程项目建设过程中的地位也越来越重要。今天我们来聊一聊空调维修时出现制冷故障的情况。
  With the continuous improvement of people's living standards and working conditions, the application of air conditioning and refrigeration system in residential construction projects is more and more extensive. The impact of air conditioning and refrigeration system on the normal use of the project is more and more great, so the position of air conditioning and refrigeration system in the construction process of the project is more and more important. Today, let's talk about the refrigeration failure during the maintenance of air conditioner.
www.nissanxs.com
  影响空调制冷系统的因素很多。空调制冷系统的建设包括许多环节和规定。空调和制冷系统的安装必须符合相关规定。空调制冷系统施工的质量控制可通过以下方法实现。
  There are many factors that affect the air conditioning and refrigeration system. The construction of air conditioning and refrigeration system includes many links and regulations. The installation of air conditioning and refrigeration system must comply with relevant regulations. The quality control of air conditioning and refrigeration system construction can be realized by the following methods.
  1.制冷设备和制冷附属设备的安装应符合下列要求:
  1. The installation of refrigeration equipment and auxiliary refrigeration equipment shall meet the following requirements:
  (1)制冷设备、制冷附属设备的型号、规格和技术参数必须符合设计要求。合格证、产品性能检验报告;(2)设备的混凝土基础在安装前必须进行质量交接和验收。(3)设备安装位置、标高和管口方向必须符合设计要求。对于用螺栓固定在地面上的制冷设备或辅助制冷设备,垫片的放置位置应正确且紧密接触。螺栓必须拧紧,必须采取防松措施。应全面检查检验数量。检验方法是参照图纸检查设备型号、规格、产品质量证明和性能检验报告。
  (1) The model, specification and technical parameters of refrigeration equipment and auxiliary refrigeration equipment must meet the design requirements. Quality certificate and product performance inspection report; (2) the concrete foundation of the equipment must be handed over and accepted before installation. (3) The installation position, elevation and nozzle direction of the equipment must meet the design requirements. For the refrigeration equipment or auxiliary refrigeration equipment fixed on the ground with bolts, the gasket shall be placed correctly and closely contacted. The bolts must be tightened and anti loose measures must be taken. The inspection quantity shall be checked comprehensively. The inspection method is to check the equipment model, specification, product quality certificate and performance inspection report with reference to the drawings.
  2.直接膨胀式表面冷却器的外观应保持清洁和完整,空气和制冷剂应反向流动。表面冷却器与外壳周边之间的间隙应紧密堵塞,冷凝水排放应顺畅。应全面检查检验数量。检验方法是观察和提取。
  2. The appearance of direct expansion surface cooler shall be clean and complete, and air and refrigerant shall flow in reverse direction. The gap between the surface cooler and the surrounding of the shell shall be tightly blocked, and the condensate discharge shall be smooth. The inspection quantity shall be checked comprehensively. The inspection method is observation and extraction.
  3.燃油系统的设备和管道以及储油罐和日用油罐的安装、定位和连接方法应符合设计和消防要求。燃气系统设备的安装应符合设计和消防要求。压力调节装置和过滤器的安装和调整应符合设备技术文件的规定,并应可靠接地。应全面检查检验数量。检查方法应根据图纸检查、观察和查阅接地试验记录。
  3. The installation, positioning and connection methods of the equipment and pipelines of the fuel oil system as well as the oil storage tank and daily oil tank shall meet the design and fire protection requirements. The installation of gas system equipment shall meet the design and fire protection requirements. The installation and adjustment of the pressure regulating device and filter shall comply with the provisions of the technical documents of the equipment, and shall be reliably grounded. The inspection quantity shall be checked comprehensively. The inspection method shall check, observe and consult the grounding test records according to the drawings.
  4.制冷设备的各项密封性试验和试运行的技术数据应符合设备技术文件的规定。对于现场组装的制冷机组和加注制冷剂的机组,必须进行排污、气密性试验、真空试验和制冷剂加注泄漏检测试验,相应的技术数据必须符合产品技术文件和国家现行相关标准规范的规定。应全面检查检验数量。检查方法采用并排观察、检查和审查试运行记录。
  4. The technical data of the sealing test and test run of the refrigeration equipment shall conform to the provisions of the technical documents of the equipment. For the refrigeration unit assembled on site and the unit filled with refrigerant, the blowdown test, air tightness test, vacuum test and refrigerant filling leakage test must be carried out, and the corresponding technical data must comply with the provisions of the product technical documents and the current relevant national standards and specifications. The inspection quantity shall be checked comprehensively. The inspection method is to observe, inspect and review the commissioning records side by side.